D

Industry 4.0 and manufacturing execution systems

I connect the factory floor to management: MES, SCADA, and smart-factory readiness — so the production number becomes a live fact, not a late report.

01The problem

Production is recorded by hand or in isolated systems, so the number reaches management late and disagrees with inventory and finance.

Who it is for

  • A plant that records production by hand or in spreadsheets.
  • Shop-floor systems that don't talk to the ERP.
  • MES or SCADA proposals that need an independent evaluation.

02What the engagement includes

  • Smart-factory readiness assessment against SIRI
  • MES requirements
  • SCADA proposal evaluation
  • Connecting the factory floor to the ERP
  • Acceptance test plan for the delivered system

03Stages

  1. 01 Assessment Plant readiness, and where production is recorded today.
  2. 02 Requirements What the system captures on the floor, and how it reaches management.
  3. 03 Selection Proposals evaluated against written criteria.
  4. 04 Integration & acceptance Integration with the ERP, and acceptance tests against what was signed.

05Common questions

Is Industry 4.0 only for large factories?

No. It starts with one question: where is production recorded today, and who is waiting for it? The first step is usually smaller than you expect.

Do you implement the systems yourself?

I lead the project on the factory's side, working with the implementing vendor: requirements, selection, testing and acceptance.

A systems project that is stalling, or has not started yet?

One message is enough to know where to start. I'll reply within one business day.

Discuss your project
Cart 0 Checkout